Webinar: Practicality of Implementing Sub-Clause 8.4 [Advance Warning] of the FIDIC 2017 Red Book in Egypt
In the FIDIC 2017 form of contracts, a new clause emerged (Sub-Clause 8.4) which requires the Employer, Engineer and Contractor to jointly collaborate and provide advance warnings to each other for the best interests of the project. A key question arises: Is such a requirement really practical in the Egyptian construction industry and, in fact, the MENA region as a whole? This topic is the focus of a masters research by Eng. Gehad Ibrahim at the Construction Engineering Department of The American University in Cairo. Join us in this special webinar where Eng. Gehad is joined with his supervisors Dr. Samer Ezzeldin and Dr. Waleed El Nemr to discuss this important topic.
