Webinar:
Accelerated Route to Membership in International Arbitration Programme ARM
Moderator
- 8 June 2026
- 6:00 PM Cairo Time
- Online
- English
Estimating construction productivity losses requires robust methods, with the measured mile and its variants being most critical. Presenting such claims convincingly demands strong documentation and visual aids. This paper extends the advanced measured mile by introducing an integrated model using ML algorithms, combining schedule data, progress reports, and site photographs to validate and improve productivity loss assessments.
Key Highlights
• Expert Witness and Practicing Arbitrator in construction dispute resolution and mediation
• Forensic specialist in delay, disruption analysis, and quantum determination for Saudi Aramco, Dhahran KSA
• Educated in Construction Law & Arbitration (LLM, Robert Gordon University, UK), Civil Engineering(USTHB, Algeria), and licensed as a Professional Engineer through APEGA, Canada
• Affiliated with The Academy of Experts (UK) and CIArb (UK & Canada branches).
Focus : Dispute Resolution and Mediation for construction contractors and clients across North America and the Middle East.

